Installation Process

1. Preparation / 2. Assembly / 3. Binding / 4. Utilities / 5. Shotcrete / 6. Finishing

1. Preparation – The foundation and rebar is prepared at the project side.2. Assembly – M-System panels are delivered to the site and installed rapidly.2. Assembly – M-System panels are delivered to the site and installed rapidly.3. Binding – Steel cross braces, u-meshes and angle meshes are bound to the panels which provide reinforcement.4. Utilities – Mechanical, electrical and plumping utilities are embedded into the panels.5. Shotcrete – All sides of the panels are sprayed with concrete.5. Shotcrete – All sides of the panels are sprayed with concrete.6. Finishing – The panels are then coated with a wide array of finishes.6. Finishing – The panels are then coated with a wide array of finishes.